COURSE PREVIEWAbout this course
“This course contains the use of artificial intelligence.”
Master Earned Value Management, EIA-748-E, Project Controls, Cost and Schedule Performance, Forecasting, Baseline Management, and Performance Reporting through Practical Case Studies.
Take Control of Project Cost, Schedule and Performance
Are you managing projects where costs appear to be under control, but progress keeps falling behind schedule?
Do you struggle to determine whether your project is genuinely performing well, or whether traditional financial reports are hiding potential overruns and delays?
Are you looking to understand Earned Value Management (EVM) beyond basic formulas and apply it confidently to real engineering, construction, infrastructure, defence, and industrial projects?
Welcome to AACE EVP Exam Prep: Earned Value Management Full Course — a comprehensive professional course covering the complete EVM lifecycle, from fundamental principles to advanced performance forecasting and management decision-making.
Through 45 detailed lessons organised into 9 comprehensive sections, you will develop a practical understanding of how to establish, implement, analyse, and maintain an effective Earned Value Management System (EVMS).
This course covers the EIA-748-E standard and its 27 guidelines, as well as practical methods for integrating scope, cost, schedule, accounting, risk, and project performance into a coherent management system.
Rather than focusing only on formulas, the course explores the decisions, calculations, controls, and reporting methods used by professional project managers and project controls specialists.
Why Earned Value Management Matters
Traditional project reporting often compares actual expenditure against planned expenditure. However, spending less than planned does not necessarily mean a project is performing successfully. A project could be spending below its planned budget simply because it has completed less work than expected.
Earned Value Management addresses this problem by combining three essential measurements:
Planned Value (PV): The budgeted value of work scheduled to be completed.
Earned Value (EV): The budgeted value of work actually completed.
Actual Cost (AC): The actual expenditure incurred for the work performed.
By integrating these measurements, project managers can objectively evaluate cost and schedule performance, identify emerging problems, forecast outcomes, and implement corrective actions.
What Makes This Course Different?
This is not simply an introductory EVM course. It provides an extensive examination of the Earned Value Management lifecycle, from planning project scope and developing control accounts to analysing performance, forecasting completion costs, and reviewing EVMS compliance.
Key features include:
45 structured professional lessons.
EIA-748-E and the principles behind its 27 guidelines.
Practical earned value calculations and worked examples.
Integrated project scope, schedule, and cost management.
Budget development and Performance Measurement Baselines.
Cost accounting, indirect costs, and subcontract management.
Advanced forecasting techniques and Earned Schedule analysis.
Variance analysis, corrective actions, and management reporting.
Baseline change control and EVMS surveillance.
Earned Value Management in Agile and Hybrid projects.
An integrated engineering project case study with a final performance review.
The course uses the fictional Fernhollow engineering project to demonstrate how EVM is applied across the project lifecycle, with practical examples involving project budgets, progress measurements, cost variances, schedule delays, forecasting, risk exposure, baseline changes, and executive reporting.
Section 1 — Earned Value Management Foundations
Understand the principles, terminology, industry standards, and contractual foundations of Earned Value Management.
Topics include:
Planned Value, Earned Value, and Actual Cost.
Budget at Completion and project baselines.
EIA-748-E and the 27 EVMS guidelines.
The five EIA-748-E process groups.
EVMS policies, procedures, and system descriptions.
Contract types and Earned Value Management requirements.
Incentive-fee arrangements and commercial considerations.
Introduction to the Fernhollow project case study.
Learning outcome: Understand how EVM operates as an integrated project performance management system.
Section 2 — Organising the Work
Learn how project scope and responsibilities are structured to support reliable performance measurement.
Topics include:
Statement of Work (SOW).
Work Breakdown Structure (WBS).
WBS dictionaries.
Organisational Breakdown Structure (OBS).
Subcontractor responsibility allocation.
Responsibility Assignment Matrices (RAM).
Control Account design.
Control Account Managers (CAM).
Work Authorisation Documents.
Integration of subsidiary project controls systems.
Learning outcome: Understand how to organise scope, responsibility, and work authorisation within an EVMS.
Section 3 — Planning and Scheduling
Explore the relationship between effective scheduling and reliable earned value measurement.
Topics include:
Integrated Master Schedule (IMS).
Network logic and activity relationships.
Activity durations and the Critical Path Method.
Milestones and objective progress indicators.
Schedule health assessment.
Resource loading and levelling.
Labour demand forecasting.
Schedule Risk Analysis.
Monte Carlo simulation.
Learning outcome: Understand the scheduling foundations required to establish and maintain reliable performance baselines.
Section 4 — Budgeting and Earned Value Techniques
Learn how project budgets are developed, assigned, and progressively earned through measurable work accomplishment.
Topics include:
Work Packages and Planning Packages.
Rolling-wave planning.
Labour, material, and subcontract budgets.
Other Direct Costs.
Weighted milestone techniques.
Fixed-formula measurement methods.
Physical percent complete.
Units-completed methods.
Level of Effort (LOE).
Apportioned Effort.
Performance Measurement Baseline (PMB).
Management Reserve (MR).
Undistributed Budget (UB).
Contract Budget Base (CBB).
Learning outcome: Understand how to construct a credible budget baseline and select appropriate earned value measurement methods.
Section 5 — Accounting Considerations
Explore how actual costs are captured, classified, reconciled, and incorporated into an EVMS.
Topics include:
Direct cost collection.
Charge numbers and cost coding.
Timekeeping systems.
Accounting calendars.
Accruals and estimated actual costs.
General ledger reconciliation.
Fringe, overhead, and G&A rates.
Indirect cost variances.
Material price and usage variances.
Cost aggregation by WBS and OBS.
Subcontract cost monitoring.
Learning outcome: Understand the financial and accounting information required for reliable earned value analysis.
Section 6 — Measuring Project Performance
Learn how to measure and interpret the performance of projects using the core Earned Value Management metrics.
Topics include:
Project status collection.
Progress validation against the baseline.
Cost Variance (CV).
Schedule Variance (SV).
Cost Performance Index (CPI).
Schedule Performance Index (SPI).
Earned Schedule.
Time-based schedule performance indicators.
EVM data validation.
Performance anomaly detection.
Labour, material, and subcontract performance analysis.
Learning outcome: Calculate, interpret, and validate project performance indicators.
Section 7 — Forecasting and Performance Reporting
Develop the skills required to forecast project outcomes and communicate meaningful project performance information.
Topics include:
Estimate at Completion (EAC).
Estimate to Complete (ETC).
Variance at Completion (VAC).
Index-based forecasting.
Bottom-up forecasting.
Latest Revised Estimates.
To-Complete Performance Index (TCPI).
Forecast reasonableness assessments.
Variance thresholds.
Root-cause analysis.
Variance Analysis Reports.
Corrective Action Logs.
IPMDAR reporting concepts.
Project dashboards and performance trend charts.
Executive programme reviews.
Learning outcome: Evaluate forecast credibility, investigate performance problems, and prepare meaningful management reports.
Section 8 — Baseline Change Control and EVMS Surveillance
Understand how to maintain control of approved project baselines while managing changes throughout the project lifecycle.
Topics include:
Baseline Change Requests (BCRs).
Change Control Boards.
Management Reserve utilisation.
Undistributed Budget and contingency management.
Retroactive baseline changes.
Accounting freeze periods.
Rate changes.
Over-Target Baselines (OTB).
Formal reprogramming.
EVMS surveillance.
Data quality reviews.
Compliance assessments.
Learning outcome: Understand how to maintain baseline integrity and manage authorised changes within an EVMS.
Section 9 — Integration and Capstone Project
Bring together all the major EVM principles through an integrated project performance management scenario.
Topics include:
Integrated Baseline Reviews (IBR).
Risk-adjusted cost estimates.
Management Reserve adequacy.
EVM in Agile and Hybrid delivery environments.
Performance memoranda.
Communicating project performance to senior management.
Integrated project controls decision-making.
Learning outcome: Develop an integrated assessment of project performance and communicate recommendations based on credible cost, schedule, risk, and forecast information.
Final Capstone — Fernhollow Month-18 Performance Review
Apply the techniques covered throughout the course to a comprehensive fictional engineering project. The capstone includes:
Baseline and budget reconciliation.
Cost and schedule variance calculations.
CPI and SPI trend analysis.
Earned Schedule performance assessment.
EAC forecasting scenarios.
TCPI analysis and forecast realism.
Management Reserve and risk exposure.
Contractual and commercial implications.
Corrective action evaluation.
Executive performance reporting.
Who Should Take This Course?
Project Managers and Senior Project Managers.
Project Controls Engineers and Project Controls Managers.
Planning and Scheduling Engineers.
Cost Engineers and Cost Controllers.
Programme Managers and Project Directors.
Construction Managers and Engineering Managers.
Contract Managers and Commercial Professionals.
Infrastructure, Energy, Defence, and Industrial Project Professionals.
Professionals developing their Earned Value Management and EVMS knowledge.
Engineers and management professionals seeking advanced project performance analysis skills.
Course Requirements
No previous Earned Value Management experience is required. Basic familiarity with project management, scheduling, budgeting, or engineering project delivery will be beneficial. A calculator or spreadsheet application may help students practise the calculations. No specialised scheduling or project management software is required.
Take the Next Step in Your Project Controls Career
Earned Value Management is much more than a collection of financial formulas. It is a structured management discipline that helps project professionals understand performance, recognise emerging problems, evaluate forecasts, and take informed corrective action.
Whether you are starting your project controls career or strengthening your existing management capabilities, this course provides a structured foundation for applying EVM principles to complex projects.
Enrol today and develop the knowledge to measure, analyse, forecast, and manage project performance with confidence.
Disclaimer: This is an independent educational course and is not officially endorsed or accredited by AACE International, SAE International, NDIA, or any other certification body. Completion does not guarantee professional certification, examination success, or EVMS compliance approval.
What you'll learn
- Master PV, EV, AC, BAC, CPI, SPI, cost variances and schedule variances through practical earned value calculations.
- Understand the EIA-748-E standard, its 27 guidelines and how Earned Value Management Systems are structured and implemented.
- Develop work breakdown structures, control accounts, integrated schedules, project budgets and performance measurement baselines.
- Apply earned value techniques, including weighted milestones, fixed formula, physical percent complete and level of effort.
- Calculate EAC, ETC, VAC, TCPI and Earned Schedule metrics to analyse project performance and forecast completion outcomes.
- Analyse project cost, schedule, labour, material and subcontractor performance through worked engineering case studies.
- Manage baseline changes, management reserves, performance variances, corrective actions and EVMS surveillance processes.
- Complete an integrated EVM project case study involving forecasting, risk assessment and executive performance reporting.
Before you begin
- No previous Earned Value Management experience is required.
- Basic understanding of project management, scheduling, budgeting, or cost management is helpful.
- Familiarity with engineering, construction, infrastructure, or industrial projects is beneficial but not mandatory.
- A calculator or spreadsheet application may help students practise the calculations.
- No specialised project management or scheduling software is required.
Who this is for
- Project Managers, Senior Project Managers, Programme Managers, and Project Directors.
- Project Controls Engineers, Cost Engineers, Planning Engineers, and Scheduling Professionals.
- Cost Controllers, Construction Managers, and Engineering Project Managers.
- Commercial Managers and Contract Administration Professionals.
- Professionals responsible for project budgeting, performance monitoring, forecasting, and reporting.
- Defence, infrastructure, energy, and industrial project professionals.
- Engineers seeking to strengthen their EVM, EVMS, and project controls knowledge.
- PMP and AACE EVP certification candidates seeking supplementary EVM knowledge.
How do you feel about this course?
Share your reaction. Select one emoji to leave or update your rating.
Please wait 30 seconds to explore this course.
This course opens on an external website.
Join the conversation
Share a thought or question. No account required.
Be the first to share your thoughts.



